The look is aware of a number of hard environmental problems, which includes floodplain, sensitive habitat, and an current uncovered wastewater line, all in a very minimal trail easement. The design solutions integrated elevating the trail having a modular concrete boardwalk that straddled the wastewater line thereby hiding it, together with 3 orga